MORE THAN FIFTY CREATIVE YEARS

Business Association Rudis was established on December 7, 1959.

 

On that day its constituent members - Investicijski biro Trbovlje, Rudnik rjavega premoga Trbovlje – Hrastnik, and Strojna tovarna Trbovlje - agreed on the mode of their cooperation and purpose of the new Business Association. With the joined know-how and capacities of its founders the then established Business Association was able to offer to the market comprehensive engineering services in the field of mining investment facilities.

Since then Rudis has been developing its know-how, gaining experience and projecting advanced solutions. By numerous significant references Rudis spreads its reputation to many countries of the world. The present-day Rudis is a renowned specialist in implementation of complex projects, mainly in the field of energetics, ecology and industry. The complete path of more than fifty-year development of Rudis is described in detail in the presentation brochure - Rudis katalog 2016.

 

 

FACTS AND NUMBERS OF RUDIS' UNIVERSE

2016

06-pekarna-hail-sa-2
  • Rudis signs a contract with the Ministry of Health for the reconstruction of the General Hospital in Trbovlje
  • Rudis signs a contract with the company of Soške elektrarne (Nova Gorica) for supply and installation of electrical equipment in the Plave I Hydroelectric Power Plant
  • Rudis signs two contracts with the Swiss company of Buhler for the installation of cupcakes line and micro dosing unit in Saudi Arabia
  • Rudis undertakes renewal and adaptation of the Quality Management System and the Environmental Manage­ment System in accordance with the new ISO 9001:2015 and ISO 14001:2015 standards
  • Rudis Middle East in Riad takes up to the assembly of the luggage conveyor line at the King Khalid International Airport Terminal 5 in Riad,
  • Rudis Mont employs 50 fitters and welders, carrying out the majority of its works in Germany
  • Rudis starts its own investment project - the construction of an attractive residential and business facility in Trbovlje, named R-K5

2015

03-nrdp-0
  • he flue gas desulphurisation plant of the 600 MW Unit, the waste products preparation and transportation plant and the coal transportation system in the Šoštanj Thermal Power Plant are handed over to their customers; with the total contract value exceeding 120 million Euro; this project is considered one of the greatest deals in the company's history
  • Rudis patents its improvements of the flue gas purifica­tion technology based on the limestone ground wet calcite procedure at the European Patent Office
  • Rudis signs a contract for the landscaping of the Šoštanj Thermal Power Plant Unit 6
  • Rudis takes part in the ICCI - International Energy and Environment Fair and Conference in Istanbul, Turkey for the third year in a row
  • Rudis sings a contract with the Swiss company of Buhler AG for the supply of metal structures and polyester silos for the storage of raw material and the installation of the entire technological equipment of a new Hail bakery in Saudi Arabia
  • the Rudis made 102 kilowatt (kW) solar power plant - the first of its kind in Kosovo -, starts producing electricity on a regular basis
  • Rudis enters into an agreement with the ELEM Macedonia to elaborate a study on modernisation and rehabilitation of the REK Bitola Thermal Power Plant, aimed at reducing SOx emissions, dust particles and other harmful emissi­ons from the thermal power plant
  • the subsidiary companies of Rudis Mont and R-RSD move their operations to the new business premises in Trbo­vlje, bought by Rudis from the Nova Ljubljanska banka
  • two company managers - Director-General and Projects Director are appointed for a five-year term
  • a new Strategic Development Plan is adopted at the Annual General Meeting for the period until 2021

2014

plave
  • following the aggregate synchronisation with the 110 kV network in the Doblar I Hydroelectric Power Plant on the Soča River, Rudis successfully brings to an end the demanding replacement of its three 16 MVA aggregates
  • Rudis signs a contract for construction and maintenance of a small gas powered plant at the non-hazardous waste dump in Puconci
  • Rudis wins a contract for the on-site assembly of a new gas cogeneration unit, as well as for the execution of construction works, including the supply and installation of the mechanical and electrical equipment with the control and monitoring system in the Polaj District Heating Plant
  • the 600 MW Unit 6 boiler in the Šoštanj Thermal Power Plant is successfully started for the first time together with the Rudis made flue gas desulphurisation plant and the power plant auxiliary systems
  • Rudis signs a contract for the construction of a hot water distribution system in Lokovica
  • Rudis successfully completes the reengineering of its company's communication system
  • Rudis signs a contract with the company of Soške ele­ktrarne for supply and installation of generators in the Plave I Hydroelectric Power Station on the Soča River.

2013

01-odpadni-produkti-00
  • Rudis signs a contract with the Šoštanj Thermal Power Plant for the construction of a waste products manage­ment system in the plant's new Unit 6
  • Rudis is selected as a contractor in the energy-saving renovation project of the Celje Hospital, which also includes the deployment of a combined cooling, heating and power generation
  • as a successful and financially solvent business entity Rudis is included on an eminent list of the 50 Slovenian companies, boasting the highest rating in 2012
  • Rudis takes part in the annual ICCI - International Ener gy and Environment Fair and Conference in Istanbul, Turkey, where it presents its advanced technology in the field of air purification or flue gas desulphurisation
  • Rudis purchases its own business share of 25% from the company of Cottagon Invest ltd
  • Rudis signs a contract for the entry of the capital of the company of Fuel Boss into its subsidiary Rudis Mont to potentially open some new possibilities for the market entry in Germany and EU
  • Rudis becomes a contractor within the construction project of the Central Purification Plant in Zagorje ob Savi with a capacity of 11.000 population units


2012

hladilni-sistem-7
  • Rudis hands over to the customer Soenergetika ltd Kranj two combined heat and power plants with the auxiliary equipment at the Planina Boiler House in Kranj, Slovenia
  • Rudis launches the assembly of the Flue Gas Desulphurisation Plant at the Šoštanj Thermal Power Plant Block 6 in Slovenia
  • complying with the contractual schedule, Rudis completes the construction of the 164 metres high cooling tower for the new Šoštanj Thermal Power Plant Block 6
  • Rudis completes the econstruction of the fuel oil reservoirs and capture tubes at the Šiška Heating Plant in Ljubljana, Slovenia
  • Rudis is assigned the Certificate of Excellence AAA - the highest rating of business entity, bestowed upon only a select few, most financially solvent, successful and trustworthy business entities
  • within the construction of the cooling system at the Šoštanj Thermal Power Plant Block 6 Rudis sees to a demanding transportation of a part of a flue gas channel of exceptional size: diameter 8 metres, length 45 metres, weight 100 tons
  • Rudis signs a contract with the Šoštanj Thermal Power Plant on the construction of the waste products system for the new Block 6
  • delivery and assembly of bulletproof walls for training centre in Kuwait
  • Rudis is selected to implement the energy improving of the General Hospital in Celje, inclusively with trigeneration

2011

2011
  • Rudis launches a demanding construction of the cooling tower for the new Block 6 at the Šoštanj Thermal Power Plant in Slovenia
  • Rudis completes the replacement of the first of the three 16 MVA aggregates at the Doblar I Hydro Power Plant on the Soca River in Slovenia
  • Rudis launches the construction of the two combined heat and power plants at the Planina Boiler House in Kranj, Slovenia
  • Rudis completes the second phase of works at the Slovenian National Opera and Ballet Theatre in Ljubljana, thus the mechanical stage equipment, enabling the cutting-edge theatre production is finally handed over to the customer
  • Rudis continues the works within the 1st and 2nd reconstruction phases of the fuel oil reservoirs at the Šiška Heating Plant in Ljubljana, Slovenia
  • Rudis is visited by His Excellency, Toshimitsu Ishigure, Ambassador of Japan in Slovenia; at their meeting the Ambassador and the General Director of the Company of Rudis, Andrej Gorjup, M.Sc. discuss the exchange of experience and business practices within the cooperation between the Japanese and Slovenian companies
  • the Swiss Company Cottagon SA becomes the majority shareholder of the Company of Rudis, thus the later transforms itself from the joint stock company into the limited liability company

2010

2010
  • Rudis signs a contract with the Company of Energetika Ljubljana on the reconstruction of the fuel oil reservoirs and capture tubes at the Šiška Heating Plant in Ljubljana, Slovenia
  • as a leading partner within the consortium with the German Company of SPX Cooling Technologies GmbH from Ratingen Rudis signs a contract with the Šoštanj Thermal Power Plant on the construction of the cooling system of the new, 600 MW Block 6 at the Šoštanj Thermal Power Plant, Slovenia
  • Rudis signs a contract with the Ministry of Culture on the second phase of works at the Slovenian National Opera and Ballet Theatre in Ljubljana, including the upgrading of the mechanical stage equipment
  • following the solemn launch and successful trial operation of the first Slovenian pumped-storage hydro power plant in Avce on the Soča River handover documents are signed by the project customer Soške Elektrarne Nova Gorica and Rudis
  • Rudis delivers balance and measuring equipment for the heating plants in Niš, Kragujevac and Pirot in Serbia
  • Rudis delivers and installs a new combined heat and power block in the Hrastnik Heating Plant in Slovenia for the Petrol Energetika Ravne na Koroškem
  • within the reconstruction of the Doblar I Hydro Power Plant on the Soča River in Slovenia, Rudis launches the replacement of the first of the plant's three 16 MVA aggregates
  • Rudis constructs, delivers and assembles the inclined lift at the Mostec Ski Jump in Ljubljana, Slovenia
  • Rudis launches the instalment of the technological equipment and software for a new military shooting range in Škrilj near Kočevska Reka

2009

2009
  • on behalf of the Rudis - Esotech - Engineering Doberšek Consortium Rudis signs a contract for the construction of the flue gas desulphurisation plant on the Šoštanj Thermal Power Plant new Block 6 with a capacity of 600 MW
  • on behalf of the Rudis - Litostroj Tower Consortium Rudis signs a contract for the reconstruction of the Doblar I Hydroelectric Power Station, for a complete replacement of the turbine and generator equipment with the auxiliary systems
  • Rudis signs a contract for the execution of mining operations with the Operta BBM Company from Germany
  • Rudis starts the restoration of the rubber linings in the draught fan of the flue gas desulphurisation plant on the Šoštanj Thermal Power Plant Block 4
  • Rudis provides the project documentation for the energy facility - a trigeneration in the Era City Business and Residential Centre in Skopje, Macedonia
  • Rudis delivers electronic equipment for the Thermal Power Plants in Kraljevo, Sombor and Zrenjanin in Serbia
  • Rudis finishes the construction of the pumping-up Avče Hydroelectric Power Plant on the Soča River
  • Rudis celebrates its 50th anniversary as an oldest operating contracting engineering company in Slovenia

2008

2008
  • Rudis establishes the Rudis Middle East subsidiary in Riyadh, Saudi Arabia
  • Rudis starts the contractual operations of the second cogeneration installation into the Polaj Heating Plant in Trbovlje
  • Rudis starts the reconstruction operations for the Finnish Ambassador Residency in Alger, Algeria
  • Rudis starts executing its contractual obligations on the assembling of the stage mechanisation in the Slovene National Theatre Opera and Ballet in Ljubljana
  • Rudis finishes the construction of the Neurological Clinic in Ljubljana, for which the company provides supervision services since 2001

2007

2007
  • the Company of Primorje acquires a 100 per cent capital share in the Rudis Company
  • Rudis establishes an on-site assembly subsidiary Rudis Mont, ltd.; it is for the first time in the Company's history that it acquires its own assembly team
  • Rudis signs a contract for the reconstruction of the boiler room in Čardak, Črnomelj
  • Rudis constructs a cogeneration device for the combined heat and power production in the boiler room in Meblo, Nova Gorica
  • Rudis signs a contract for the construction of the storing and mixing mine filling fly ash plant in the Stan Terg Mine, Kosovo
  • Rudis constructs its most important business and residential building for the market, i.e. The Vodnikov dvor in Ljubljana, consisting of 98 apartments and 12 business premises
  • Rudis finishes the reconstruction of the biomass ESR Energie Sulzbach - Rosenberg Heating Plant in Germany
  • Rudis provides a professional supervision within the construction of the En plus filling stations in Slovenia to the investor
  • Rudis supplies and assembles the technological equipment for four standard infantry firing ranges at the Mlake firing Range near Vipava
  • Rudis constructs the gas turbines operating facility in the Šoštanj Thermal Power Station

2006

2006
  • Rudis obtains the ISO 14001 Environment Protection Certificate and the OHSAS 18001 Health and Safety at Work Certificate
  • Rudis signs a contract for the construction of the communal wastes heat treatment auxiliary systems in the Celje Heating Plant
  • Rudis starts yet another of its investments projects, i.e. the construction of the three villa apartment blocks Vila M in Ljubljana, earmarked for sale on the market
  • Rudis provides the consulting engineering services for the construction of the Adria Trailers, Mobile Homes and Campers Factory in Novo mesto
  • Rudis delivers and installs the technological equipment for the Kenog Boiler Room of the E3 Company in Nova Gorica
  • Rudis delivers and installs the inclined lift ski jumpers transport device in Žiri

2005

2005i
  • Rudis signs a contract on design, delivery and assembly of the technological equipment (turbine, generator with excitation system and auxiliary systems) for a first var-speed reversible pumping up hydroelectric power plant in Europe, the pumping-up Avče Hydroelectric Power Plant on the Soča River
  • Rudis finishes technological modernisation and reconstruction of the slag transportation system in the Ugljevik Thermal Power Plant in Bosnia and Herzegovina
  • Rudis elaborates the project documentation for the waste waters ecological rehabilitation within the sodium phosphide production in the TKI Hrastnik Company
  • Rudis constructs the combined heat and power production facility in the Polaj Heating Plant in Trbovlje
  • Rudis delivers and installs the equipment for the Prevala Four Seat Chair Lift on the Mount Kanin

2004

2004
  • Rudis signs a contract on the construction of the flue gas desulphurisation plant in the Trbovlje Thermal Power Plant
  • Rudis starts the construction of a new special glass packaging manufacture factory in Hrastnik
  • Rudis carries out a supervision services for the new Adria Holiday Campers and Mobile Homes Manufacture Complex construction in Novo mesto
  • Rudis delivers and installs the stage mechanisation for the Cultural Centre in Lendava
  • Rudis carries out both reconstruction and extension of the Textile Supply Department in the Maribor General Hospital
  • Rudis constructs the gas boiler room facility for the Kranj Health Care Centre

2003

2003
  • Rudis establishes the Company of Rudis BH Sarajevo
  • Rudis delivers and installs the old hall stage mechanisation in the Slovene National Theatre in Maribor
  • Rudis executes the reconstruction of the K5 boiler for the Vipap Videm Krško Paper Mill
  • Rudis offers the machines reconstruction and staff training services in the Company of Kosovomont in Pristina, Kosovo
  • Rudis starts the construction of the Unično Regional Damping Area in Hrastnik
  • Rudis finishes the construction of the Bonneuil sur Marine Dry Mortars Production Process Tower in France
  • Rudis reconstructs the 2 x 2.5 MW Boiler Room in Zagorje ob Savi
  • Rudis constructs the kindergarten in Moravče
  • Rudis starts the extension and reconstruction works of the Ivan Skvarč Primary School in Zagorje ob Savi
  • Rudis executes the delivery and on-site assembly operations on the steel tunnel panelling for the Kastelec tunnel right tube
  • Rudis delivers and installs the stage mechanisation in the Kosovel dom in Sežana

2002

2002
  • Rudis establishes the Company of Rudis BH Sarajevo
  • Rudis delivers and installs the old hall stage mechanisation in the Slovene National Theatre in Maribor
  • Rudis executes the reconstruction of the K5 boiler for the Vipap Videm Krško Paper Mill
  • Rudis offers the machines reconstruction and staff training services in the Company of Kosovomont in Pristina, Kosovo
  • Rudis starts the construction of the Unično Regional Damping Area in Hrastnik
  • Rudis finishes the construction of the Bonneuil sur Marine Dry Mortars Production Process Tower in France
  • Rudis reconstructs the 2 x 2.5 MW Boiler Room in Zagorje ob Savi
  • Rudis constructs the kindergarten in Moravče
  • Rudis starts the extension and reconstruction works of the Ivan Skvarč Primary School in Zagorje ob Savi
  • Rudis executes the delivery and on-site assembly operations on the steel tunnel panelling for the Kastelec tunnel right tube
  • Rudis delivers and installs the stage mechanisation in the Kosovel dom in Sežana

2001

2001
  • Primorje JSC from Ajdovščina becomes a majority owner of Rudis through acquisition of its shares
  • Rudis starts the reconstruction of the Peručica Hydroelectric Power Plant in Montenegro
  • Rudis reconstructs the Swimming Pool in Trbovlje
  • Rudis provides the stage technical equipment for the Workmen's Home in Trbovlje
  • Rudis constructs the tube conveyor for the fly ash and slap tag conveying in the Šoštanj Thermal Power Plant
  • Rudis starts the reconstruction of equipment, steam distribution pipes and boiler room as well as provides the consulting engineering services for the Sava Tires Company in Kranj
  • Rudis executes the extension and reconstruction works on the dry concrete mixtures mill for HTZ Velenje
  • Rudis executes the reconstruction and upgrading works in the Department of Ophthalmology in Ljubljana
  • Rudis executes the reconstruction works in the Kompole Primary School

2000

2000
  • Rudis constructs the Zeleni gaj Business and Residential Building in Ljubljana within its market construction programme
  • Rudis wins works within the reconstruction of the lignite conveying system in the Bardh and Mirash Mines for the Kosovo B Thermal Power Plant in Pristina, Kosovo
  • Rudis constructs the Primary School in Rečica ob Savinji
  • Rudis finishes the construction of the Hrastnik Glassworks Mixing Plant with the flow control system and electrical cubicle reconstruction
  • Rudis starts the construction of the Psychiatric Ward in the Maribor General Hospital; the facility was constructed on a turn-key basis
  • Rudis provides the consulting engineering services for the construction of the Polaj Sports Centre and the reconstruction of the Trbovlje Secondary Technical School
  • Rudis executes the adaptation of the Embassy of Sweden Premises in Ljubljana

1999

1999i
  • Rudis appears as an investor on the building construction market for the first time and starts the construction of the Slape Business and Residential Area in Ljubljana
  • Rudis constructs a raw-material storage and preparation plant in the BSN Glasspack Glassworks in Beziers, France
  • Rudis starts the construction of the Doblar II and Plave II Hydroelectric Power Stations
  • Rudis starts the construction of the flue gas desulphurisation plant on the Šoštanj Thermal Power Plant Block 5
  • Rudis constructs a dry mortars production plant in the Mežica Lead and Zinc Mine
  • Rudis starts the second phase of reconstruction and ecological rehabilitation in the Polaj Thermal Power Plant in Trbovlje

1998

1998
  • Rudis signs a contract for the delivery of the turbine and generator equipment with the auxiliary systems for the Doblar II and Plave II Hydroelectric Power Plants on the Soča River
  • Rudis finishes a reconstruction of the Una Hydroelectric Power Plant in Bihać, Bosnia and Herzegovina
  • Rudis supplies and installs the equipment for the Sport Hotel Alexander Palace in Skopje
  • Rudis provides the consulting engineering services for the Goodyear EPE and Sava Kranj Companies
  • Rudis manufactures an application software and starts up a high-shelved storage in the Termo Company in Škofja Loka
  • Rudis starts the construction of the Blatnik VH Krč water-supply network
  • Rudis finishes the construction of the Glassworks Haldensleben Mixing Plant in Germany

1997

1997
  • Rudis signs a contract for the construction of desulphurisation plant of the Šoštanj Termal Power Plant Block 5 in a joint appearance with the German partner Deutsche Babcock Anlagen GmbH
  • Rudis finishes the construction of the Euroglas II Glassworks in Haldesleben, Germany
  • Rudis starts with the delivery and installation of 700 tons of technological equipment for the shaft in the Hrastnik Mine
  • Rudis conducts the construction of waste and other material briquetting plant and the manufacture of the application software for the Termo Company in Škofja Loka
  • Rudis constructs a gymnasium for the Trnava Primary School
  • Rudis finishes the construction of the anti-noise barrier for the electric kiln in the Metal Ravne Ironworks
  • Rudis acquires the ISO 9001 Certificate of Quality

1996

1996
  • Rudis converts itself into a joint-stock company
  • Rudis conducts the construction of the Swimming Pool Complex in Radenci
  • Rudis constructs a facility for the raw materials preparation and storage in the Gulf Guard Glassworks in Saudi Arabia
  • Rudis starts the construction of the tunnel in Zide under Trojane
  • Rudis constructs the kindergarten in Železniki
  • Rudis constructs the Health Care Centre in Radeče
  • Rudis finishes the reconstruction of the coal storage in the Plomin Thermal Power Plant in Croatia

1995

1995
  • Rudis constructs a new production hall for the cement palletisation and packaging in the Trbovlje Cement Works
  • from 1995 to 1997 Rudis constructs a coal conveying system at the damping area, an ash covneying system, a pipeline system and reconstructs a rubber conveyor in the Ljubljana Cogeneration Plant
  • Rudis finishes the construction of the REA suspension and fly ash mixing plant in the Šoštanj Thermal Power Plant
  • Rudis constructs a pneumatic ash conveying system between the Thermal Power Plant in Šoštanj and the Lignite Mine in Velenje
  • Rudis reconstructs the business and residential building, i.e. the Steisslingen cultural monument in Germany
  • Rudis executes an ecological rehabilitation of the western dumping area in the Trbovlje Thermal Power Plant
  • Rudis starts the construction of the Primary School in Trnava
  • Rudis drafts the Zagorje Brown Coal Mine closure programme

1994

1994
  • Rudis constructs the Sagco Glassworks in Jeddah in Saudi Arabia
  • Rudis carries out preparation and conveying of desulphurisation products at the flue gas desulphurisation plant on the Šoštanj Thermal Power Station Block 4
  • Rudis starts reconstruction and ecological rehabilitation of the Polaj Heating Plant in Trbovlje; these works were finished in 1996
  • Rudis finishes the construction of an apartment building with an underground garage in Kolbermoor, Germany
  • Rudis conducts the construction of the chlorine-alkaline analysis plant in the TKI Hrastnik Company
  • Rudis conducts the production technological and ecological rehabilitation and constructs the production hall on Trata for the Termo Company in Škofja Loka
  • Rudis constructs the Winter Swimming Pool in Kranj

1993

1993
  • Rudis finishes the construction of the fly ash conveying line in the Plomin Thermal Power Plant in Croatia
  • Rudis executes both the reconstruction and the ecological rehabilitation of the Hrastnik Heating Plant
  • Rudis starts constructing of the hot water line in the Municipality of Hrastnik
  • Rudis executes works in the Guardian Glassworks in Tudela, Spain
  • Rudis starts constructing of the Thermal Riviera, boasting some 1,200 sq. metres of surfaces, covered with inside and outside swimming pools in the Thermal Riviera in Čatež; the works were finished with the construction of an artificial-waves swimming pool in 1995
  • Rudis starts the reconstruction of a cultural monument, i.e. the St. Johan Business Residence in Germany
  • Rudis builds the Novy Arbat Supermarket in Moscow, Russia

1992

1992
  • Rudis constructs an automatic glassware high-shelved warehouse in the Hrastnik Glassworks
  • Rudis reconstructs the bulk cargo terminal, simultaneously increasing its capacity and automatising the wagon loading station in the Port of Koper
  • Rudis constructs the Stoelze Oberglass Glassworks in Baernbach, Austria
  • Rudis assembles two generators in the Jiroft Hydroelectric Power Station in Iran for Elin, Austria
  • Rudis starts the construction of the Podbočje Water System within the construction of the Rore - Narpelj Water Supply Network in the Municipality of Krško; these works were finished in 1996

1991

1991
  • Rudis constructs two 19-storey buildings in Abu Dhabi, United Arab Emirates
  • Rudis starts the reconstruction of the Vessel - Storage Site Coveying System in the Port of Koper; the reconstruction was finished in 1992
  • Rudis finishes coal conveying facilities in the Plomin I and II Thermal Power Plants in Croatia
  • Rudis constructs the Free Zone in Brčko, Bosnia and Herzegovina
  • Rudis constructs a petrol filling station in Zagorje
  • Rudis finishes both the first and the second construction phases of the Rore - Narpelj Water Supply Network in the Municipality of Krško; the works were finished in 1992
  • Rudis finishes the construction of the Telecommunication Systems for the Trbovlje General Post Office in Zasavje

1990

  • Rudis carries on with the execution of its works within the construction of the Schwedt Petrochemical Combine in East Germany, going on continuously since 1981
  • Rudis reconstructs a 110 kV switchyard in Trbovlje Thermal Power Station
  • Rudis constructs production hall and oil supply depots in Risan, Bosnia and Herzegovina
  • Rudis constructs five brickworks in Tolyati, Beleba, Novokuibyshevsk, Maryopol and Odessa in Russia for the German tenderers Keller GmbH and Lingl GmbH

1989

1989
  • Rudis manufactures and delivers two semi-mobile high capacity mills for the Banovići Coal Mine in Bosnia and Herzegovina
  • Rudis constructs the mountain lift and all the accompanying facilities in Luče
  • Rudis carries out the research activities in the Bor Copper Mine in Serbia
  • Rudis prepares the design documents for the ash conveying system in the Plomin Thermal Power Plant in Croatia
  • Rudis finishes the works in the Palas Hotel in Banja Luka, Bosnia and Herzegovina
  • Rudis constructs the gallery in the Trbovlje Thermal Power Plant; the construction is finished by 1990
  • Rudis constructs the conveying line for the Coal Dumping Area in the Plomin II Thermal Power Plant in Croatia; these works were finished in 1991

1988

1988
  • Rudis starts the construction of the City of Constantine Sewage Network in Algeria; the project was financed by the World Bank
  • obtaining the authorisation from the European Economic Community, Rudis becomes a holder of activities within the Slovenian part of the construction project of the 50 MW Koralpe Hydroelectric Power Plant in Austria and gains a 20 per cent share of the project's total value
  • Rudis constructs Zarrontin Intershop, Berlin residential Area, Berlin Dom Hotel, administrative building in Berlin as well as workmen's homes in Auerbachen and Oberlungwitz in East Germany
  • Rudis starts the construction of the conveying system from the Lakonca Dumping Area to the Trbovlje Thermal Power Plant; these operations were finished in 1996
  • Rudis starts the reconstruction of the coal separation in the Edvard Kardelj Energy and Mining Combine in Trbovlje, lasting until 1990
  • Rudis constructs the Winter Swimming Pool for the Physical Culture Association in Kranj
  • Rudis executes operations for the refinery modification (the SRM Project) and reconstruction of the Pressure Reducing Facility (the DAR Project) within the construction of the Schwedt Petrochemical Combine in East Germany
  • Rudis constructs a filling station for the Company of Petrol in Rogaška Slatina
  • Rudis executes the civil engineering and commercial works, electronic and mechanical equipment installations, landscaping works as well as the construction of the kerosene tank for the Aero Service Brnik Company

1987

1987
  • Rudis signs a contract for the construction of the Lakonca Coal Dump Area for the Trbovlje Thermal Power Plant
  • Rudis finishes the reconstruction of a hotel facility in Medijske toplice
  • Rudis finishes the reconstruction and refitting operations for the combined gas and coal Power Plant in Trbovlje
  • Rudis opens its new business premises on the Ajdovščina 4 in Ljubljana
  • Rudis finishes the construction of the Steelworks II for the Ironworks Jesenice

1986

1986
  • Rudis turns over its own made product, i.e. the four semi-mobile separation mills for the Đurđevik Coal Mine in Bosnia and Herzegovina
  • Rudis finishes the construction of the Rudi Čajevec Plant in Banja Luka, Bosnia and Herzegovina
  • Rudis finishes the work within the construction of the storage premises for the Interšped Banja Luka, Bosnia and Herzegovina with a total area of 2,000 sq. metres
  • Rudis exports conveyors to Iran
  • Rudis executes the displacement of the cable routes in the block 125 MW boiler in the Trbovlje Thermal Power Plant
  • Rudis finishes the construction of the energetic coal mill in the Brown Coal Mine in Trbovlje
  • Rudis signs a contract with the Davy McKee Company from London on the execution of civil engineering works, equipment delivery, on-site assembly as well as insulation and anti-corrosion protection within the construction of the Flue Gas Desulphurisation Plant in Rummelsburg, Berlin, East Germany

1985

1985
  • Rudis signs a contract on the construction of the Bük Hotel in Budapest with the Company of ABV Solna from Sweden
  • Rudis finishes the reconstruction of the coal separation for the Edvard Kardelj Mining and Energy Combine in Trbovlje
  • Rudis signs a contract with the Company of Limex Berlin on the execution of operations on the Lubmin Nuclear Power Station
  • Rudis finishes the construction of a heavy-liquid coal sepa-ration with four semi-mobile waste mills for the Đurđevik Coal Mine in Bosnia and Herzegovina
  • Rudis starts with a large scale reconstruction operations in the Trbovlje Thermal Power Plant, finished in 1999, that year the Company also starts the reconstruction of the OP 380b boiler in a 125 MW block
  • Rudis manufactures, delivers and assembles mechanical and electronic equipment for the coal classifying and loading plant in Banovići Black Coal Mine and Oskova Coal Classifying Plant in Bosnia and Herzegovina
  • Rudis executes tailings excavation and the deposit and coal excavation operations in the RMU Kamengrad Sanski most as well as operations on the Orišlje Opencast Mining in Bosnia and Herzegovina
  • Rudis executes tailings excavation, deposit operations and coal excavation operations in the Stanari Lignite Mine in Bosnia and Herzegovina
  • Rudis finishes the construction of the Vacuum Distillation Facility for the Schwedt Petrochemical Combine in East Germany
  • Rudis constructs the Waste Water Treatment Plant for the Papirnica Vevče Paper Mill
  • Rudis starts the construction of the Fužine Hydroelectric Power Plant; the construction was finished in 1987

1984

1984
  • Rudis starts the second phase of its geological researches in Konawaruk, Guiana
  • Rudis starts the construction of three road underpasses in the city of Alger, Algeria
  • Rudis signs a contract on the construction of the Steelworks II with the Jesenice Ironworks
  • Rudis opens its representative office in Libya
  • the Company prepares two projects for the Šikulje Coal Classifying Plant and the Kreka Lignite Mine in Bosnia and Herzegovina, including project documentation elaboration, on-site assembly and putting into service supervision as well as the formal facilities turn over to the contracting authority
  • Rudis continues its work within the construction for the Schwedt Petrochemical Combine in East Germany, i.e. the construction of the REKO - FCC facility
  • Rudis starts the construction of the Lar dam in Iran, within which it also takes over the injection operations; these operations were finished in 1989

1983

1983
  • Rudis finishes the construction of the new factory premises for the Company of Libela Celje, spreading over an area of 11,000 square metres
  • Rudis finishes the construction of the new premises for the Sijaj Hrastnik Factory
  • Rudis finishes the work on the Souk-El-Khamis Limekiln in Libya
  • Rudis signs a contract on the construction of the third shoe factory in Bou Saada in Algeria

1982

  • Chamber of Commerce and Industry of Slovenia awards Rudis an honorary diploma for successful management
  • Rudis finishes the construction of the second larger Aromatic Complex facility in the Schwedt Petrochemical Combine in East Germany

1981

1981
  • Rudis signs a contract on the construction of two shoe factories Frenda and El Bayadh in Algeria (with a total capacity of 1,350,000 pairs of shoes per year) with the Algerian investor La Societe Nationale des Industries des Peaux et Cuirs - Sonipec
  • Rudis signs a contract on the construction of the Visbreaker Petrochemical Facility in the East German Schwedt Petrochemical Combine with the Japanese Toyo Engineering Corporation from Tokyo
  • Rudis constructs the mountain lift on the Mount Krvavec, i.e. a two-seater lift between Tiha dolina and Veliki Zvoh, as a first company in Yugoslavia

1980

  • Rudis signs a representation agreement for the Yugoslav market with the Maschinenbau Ulm GmbH Company from West Germany
  • Rudis constructs mills in the cities of Tivat and Bar in Montenegro
  • Rudis finishes the construction of the Kostolac Industrial and Energy Combine in Serbia

1979

1979
  • Rudis collaborates in researches and mining projects of the gold-bearing alluviums on the Konawaruk River in Guiana
  • Rudis drills the water wells in Kerman, Iran
  • Rudis finishes the construction of the Energoinvest - Varnost Plant in Zagorje ob Savi
  • Rudis opens its new business premises on the Titova Road in Ljubljana
  • Rudis starts the construction of its new administrative building on the Revolution Square in Trbovlje
  • Rudis signs a contract on the construction of the Aromatic Complex facility in the Schwedt Petrochemical Combine in
    East Germany

1978

1978
  • Rudis explores the deposits of apatite and niobium in Tanzania
  • Rudis constructs 385 metres long and 21 metres wide bridge over the Tigris River with 3.1 kilometres long motorway access and exit point in Iraq
  • Rudis starts the execution of works at the Schwedt Petrochemical Combine in Germany; the works were conducted from 1978 to 1990
  • Rudis starts aerophotogrametrical and terrestrial geodetic measurements for the Coastal Belt Water Project

1977

1977
  • Rudis signs a contract on the Slovene gas network construction supervision engineering
  • Rudis executes geodetic works and exploration drillings in the Mifergui - Nimba Iron Ore Deposit in Guinea
  • Rudis opens its representative office in Belgrade
  • Rudis signs a contract on construction works in Libya
  • Rudis starts the construction works on Pljevlja Coal Mill and Classifying Plant in Montenegro
  • Rudis signs a contract on a joint appearance at the construction for the Schwedt Petrochemical Combine facility in East Germany with the Japanese Toyo Engineering Corporation from Tokyo; this was one of the largest contracts ever signed in the Company's history

1976

1976
  • Rudis finishes the construction of Golo rebro and Pletovarje tunnels on the Levec - Hoče expressway section
  • Rudis executes on-site assembly and supervision over the Hama Ironworks test operation in Syria
  • Rudis executes some geodetic works and mining area electrification in Guinea
  • Rudis constructs the loop shaped shaft limekilns with a capacity of 300 T/day for the IGM Zagorje Company

1975

1975
  • Rudis opens its representative office in Ljubljana
  • Rudis mounts a gas-turbine generator unit in the Trbovlje Thermal Power Plant
  • Rudis constructs the Blida Logistic Centre in Algeria for the Japanese Toyo Engineering Corporation

1974

  • Rudis executes geotechnical works on the Sirvan Dam and drillings of the deep observation wells on the Raza Shah Kabir dam in Iran
  • Rudis constructs mill and classifying plant in Pljevlja, Montenegro with a capacity of 300 T/h
  • Rudis starts its operations in Iran
  • Rudis establishes its branch office in Germany

1973

  • Rudis starts its long lasting and successful cooperation with the Japanese corporations; that year the company collaborates with the Toyo Engineering Corporation in the on-site assembly and insulation work in Algeria and East Germany

1972

  • Rudis starts some large scale on-site assembly and investments projects in East Germany
  • Rudis finishes the construction of the Siporex Gas Concrete Works in Izlake with a capacity of 82,000 cubic metres per year

1971

1971
  • Rudis constructs 2,300 metres long and 6 to 8 metres wide protection gallery, 500 metres deep ventilation shaft as well as chambers on the damping area in the St. Gotthard road tunnel in Switzerland
  • Rudis executes drilling operations on the Motto di Dentro tunnels in Switzerland
  • Rudis erects the rotary kilns with all the belonging appliances for conveying, grinding, milling, homogenisation and cement packaging at the Trbovlje Cement Works

1970

1970
  • Rudis constructs the Emet Collemanite Separation in Hisarcik, Turkey with a capacity of 180 T/h; the Company's own technology is used for this facility, constructed on a turn-key basis for Etibank
  • Rudis constructs a production hall and drying chambers, and executes landscaping works for the Ljubečna Brickworks
  • Rudis finishes some large scale studies and project engineering services for the Lake of Tunis; due to the strategic importance of this project, the two Rudis's representatives are received by the President of Tunisia Habibu Burgiba
  • Rudis designs, delivers and assembles mechanical equipment for coal, fly ash and slag tap conveying transportation and also constructs a water gallery and coal bunkers in the Trbovlje Thermal Power Station

1969

1969
  • Rudis delivers and installs transportation systems in the Kettara Pyrrothine Mine in Morocco with a capacity of 2,500 T/day and depth of 300 m
  • Rudis constructs a wet coal separation in Ugljevik, Bosnia and Herzegovina with a capacity of 120 T/h
  • the Company finishes the construction of a heavy-liquid coal separation in Trbovlje with a capacity of 200 T/h

1968

1968
  • Rudis starts mining investments and on-site assembly projects in Western Europe
  • Rudis opens its representative office in Frankfurt
  • Rudis constructs loop and shaft shaped limekilns for IGM Zagorje Company with a capacity of 2 x 150 T/day
  • Rudis constructs a wet coal separation in Plomin, Croatia with a capacity of 120 T/h

1967

  • Rudis opens its representative office in Berlin
  • Rudis finishes the operations within the construction of the asbestos separation in Stragari, Serbia with a production capacity of 13,500 tons of asbestos fibres per year
  • Rudis constructs a wet coal separation in Kamengrad, Bosnia and Herzegovina with a capacity of 80 T/h

1966

  • Rudis registers its activity with the United Nations Organisation in New York
  • Rudis signs its first contracts on geological researches in the Gafsa Phosphate Mines in Tunisia in the Ain Kherma area as well as a contract on the research and project engineering services at the Kalaa Djerda Phosphate Mine
  • Rudis executes its first investment projects, i.e. the civil engineering and insulation works on the industrial facilities in East Germany and Belgium
  • Rudis finishes a wet coal separation in Miljevina, Bosnia and Herzegovina with a capacity of 110 T/h

1965

  • Rudis finishes a separation in Dobro selo with a capacity of 300 T/h and a classifying plant with a capacity of 700 T/h for the REH Kosovo Combine in Pristina
  • Rudis starts the construction of the Trbovlje Thermal Power Plant Block with a capacity of 125 MW; these operations were finished in 1968

1964

1964
  • Rudis signs its first contract on the structural oil drillings in India's State of Assam
  • Rudis designs a kaolin separation in Kerala and researches the possibilities for the asbestos ore enrichment in Andra Pradesh, India
  • the Company opens its representative office in India and finishes all the operations from its first contract
  • Rudis starts geological and geophysical researches as well as exploration drillings in the Yubdo Wollega Iron Deposits, as well as in copper, platinum and other mineral raw material deposits in Ethiopia
  • Rudis opens its representative office in Ethiopia
  • Rudis constructs a heavy-liquid iron ore separation with a capacity of 460 T/h in Vareš and a chromite separation with a capacity of 20 T/h in Raduša (both in Bosnia and Herzegovina)

1963

1963
  • after the proclamation of Algeria's independence, Rudis starts geological and technological researches in this country; Rudis also signs its first contract on geological and technological researches as well as exploration drillings in zinc, lead and iron deposits (Kherzet Youssef, Djebel Gustar, El Halia, Bou Jaber, Mesloula)
  • Rudis also executes some geodetic operations in Libya

1962

1962
  • Rudis opens its representative office in Cairo, Egypt
  • Rudis starts some large scale operations in the field of geological researches in Egypt as well as drillings, studies and project engineering for Safaga, Hamrawein and Wassif Phosphate Mines, El Atchan Uranium Mine and Maghara Coal Mine deposits

1961

  • Rudis signs its first export contract on the execution of mining operations in West Germany
  • Rudis signs its first contract on the domestic market, i.e. a contract on the construction of the Kanižarica Mine
  • a consultation on the engineering organisation programme orientation with the Socialist Republic of Slovenia Government, Chamber of Commerce and Industry, social and political organisations as well as business enterprises representatives takes place in Trbovlje

1960

  • on 18th February the constituent members sign a contract on the establishment of the Company of Rudis

1959

  • on 7th December, a constituent meeting is held, on which the Rudis constituent members, i.e. Trbovlje Investment Bureau, Trbovlje - Hrastnik Brown Coal Mine and Trbovlje Machine Works, agree on their cooperation mode and the new business council purpose, which is to offer to the market the comprehensive engineering, servicing and manufacturing capacities for the construction of mining and industrial facilities
This site uses cookies. By continuing to browse this site, without changing the settings of your cookies, you accept our Terms of cookies. Accept Cookies What are Cookies?