New Boiler House E3 Meblo with CHPP

In Nova Gorica Rudis constructed the new Boiler House E3 Meblo with hot water boiler and Combined Heat and Power Plant for combined heat and power generating with high efficiency.

The power of hot water boiler is 3 MW, and CHPP during operation at maximum load generates 625 kW of electrical energy and 735 kW of thermal energy.

Employer:
E3, d.o.o. Nova Gorica
Completion date:
2008
Scope of works:

Designing, supply and assembly of mechanical and electrical equipment, plant siting or locating, computer supervisory system, testing and commissioning, elaboration of Operation and Maintenance Instructions for the plant, staff training.