Reconstruction of the boiler 5 VIPAP Videm Krško

In the paper-mill VIPAP Videm Krško Rudis realized the basic engineering, supply and assembly of furnace of boiler, power 11 MW, with fuel conveying system.

Employer:
Vipap Videm Krško
Completion date:
2003
Scope of works:

Basic engineering, supply of mechanical-technological and electrical equipment, equipment assembly, training of operators and maintenance staff, start-ups, assistance at start-ups.

This site uses cookies. By continuing to browse this site, without changing the settings of your cookies, you accept our Terms of cookies. Accept Cookies What are Cookies?