CHPP 2 in Petrol Energetika PE Hrastnik

In the Heating Plant Hrastnik the Combined Heat and Power Plant was constructed for combined heat and power generating with high efficiency of CHPP2. CHPP2 during operation at maximum load generates 1,560 kW of electrical energy and 1,586 kW of thermal energy.

The Combined Heat and Power Plant enables combined generating of heat for heating of 800 households in the heating season and electricity for 1300 households. The natural gas is used as energy-generating product.

Employer:
Petrol Energetika d.o.o.
Completion date:
2010
Scope of works:

Designing, supply and assembly of mechanical and electrical equipment, construction works, computer supervisory system, testing and commissioning, elaboration of Operation and Maintenance Instructions for the plant, staff training.