CHPP at the Central Waste Treatment Plant Škofja Loka
In the Central Waste Treatment Plant Škofja Loka reconstruction of the existing Boiler House and installation of the Combined Heat and Power Plant on biogas, released and captured at waste water treatment process, was realized. The output power of CHPP is 125 kW in 213 kW.
Employer:
Občina Škofja LokaCompletion date:
2002Scope of works:
In co-operation with the Swiss manufacturer MENAG the company Rudis realized disassembly of the existing Plant, reconstruction of the existing power house with regard to requirements of new technical regulations, norms and standards, supply and erection of the new Cogeneration Unit, integration in the system for heating of digester, connection to the electric power distribution system, computer supervisory system, trial start-up, trial run and staff training.