Reconstruction – ecological rehabilitation of the Heating Plant Polaj Trbovlje
In the scope of ecological rehabilitation of the Heating Plant in Trbovlje in the first phase in the year 1993 two new boilers, power 10.4 MW and 19.6 MW, for passage from solid fuels to gaseous fuels were installed. And in the second phase another boiler on gaseous fuel, power 10 MW, was installed.
Build: Phase I in 1993 and phase II in 1999
Employer:
Komunala Trbovlje, d.o.o.Completion date:
1999Scope of works:
Designing, supply and assembly of mechanical and electrical equipment as well as computer supervisory system, staff training, commissioning, performance tests and trial run.