Signature of Contracts for implementation of investments in the local environment
On April 22nd, 2013 Rudis signed with the Client Komunala Trbovlje the Contract for the 2nd phase of reconstruction of the hot water pipeline in Trbovlje and for construction of the loading ramp Neža.
Komunala Trbovlje supplies heat energy from the Heating Plant Polaj via the hot water pipeline network where losses are considerable and consequently reconstruction is urgent. Upon completed 1st phase of hot water pipeline reconstruction in the last year also reconstruction of the hot water pipeline on the route from Kešetovo to the bus station near the Trbovlje Municipality building will be realized this year. The hot water pipeline will run in the existing culvert into which pre-insulated pipes DN 200 and DN 150 with optimum insulation will be laid. Reconstruction of the hot water pipeline is anticipated for the summer period, during which only short interruptions of hot water supply will be possible for the reason of execution of re-connections. At the same time also cable ducts will be installed along the hot water pipeline route. [/levi]
Simultaneously with signature of the Contract for the hot water pipeline reconstruction Rudis, as the Leading partner in the Consortium RUDIS-AGM Nemec, and the Client Komunala Trbovlje signed also the Contract for construction of the loading ramp at Neža landfill. By installing the loading ramp and abrol containers the hygiene and health conditions within the collection centre at Neža landfill will be considerably improved. In addition to that also the mode of collecting and separating of individual waste raw material outside the waste sorting unit will be improved, as groups of construction waste intended for further processing are still collected and deposited in the open air – in the asphalt courtyard.